DOTD bid results for statewide projects announced

Local News

BATON ROUGE, La. (BRPROUD) – Fourteen projects were let and 12 contractors presented apparent low bids totaling $40.1 million, according to the Louisiana Department of Transportation and Development (DOTD).

“This letting marks the beginning of quite a few routine statewide projects,” said DOTD Secretary Shawn D. Wilson, Ph.D. “Of note are a couple of projects that will repair several bridges that were damaged by Hurricanes Laura and Delta, and we’re also investing over $15 million on a much-needed project to resurface 8.4 miles of U.S. 190 west of Baton Rouge.”

Bridge Replacement and Repair:

  • Replacement of Boeuf River Bridge on LA 15 in Richland Parish: $7,209,166.62
  • Electrical and mechanical repairs of bridges on LA 14 and LA 330 in Iberia and Vermilion parishes: $557,900.00
  • Electrical, mechanical, and structural repairs of bridges on LA 3147, LA 319, and LA 1246 in St. Mary and Vermilion parishes: $495,800.00

Pavement/ Overlay:

  • Milling, patching, overlay, and drainage on LA 21 between W. Jct. of LA 1083 and Fairgrounds Blvd. in St. Tammany Parish: $1,856,347.12
  • High friction surface treatment on local roads in Lafayette Parish: $316,490.50
  • Patching and asphalt surface treatment on LA 174, LA 2A, and LA 4 in Bienville, Claiborne, and Red River parishes: $1,222,590.10
  • Milling, patching, and overlay on LA 2 between West Carroll Parish line and U.S. 65 in East Carroll and West Carroll parishes: $1,692,360.12
  • Milling, paving, and drainage on LA 493 between Montrose Rd. and LA 1 in Natchitoches Parish: $2,197,292.70
  • Grading, milling, patching, overlay, and drainage on U.S. 190 between Rougon Rd. and 0.5 miles west of LA 978 in Pointe Coupee and West Baton Rouge parishes: $15,318,212.61
  • Road rehabilitation, sidewalks, and multi-use path on N. Monroe St. between S. Service Rd. W. and W. Park Ave. in Lincoln Parish: $5,560,438.27

Congestion Mitigation and Safety:

  • Guardrail installation on Grammont St. and Booth St. in Ouachita Parish: $128,305.70
  • Turn lanes on LA 511 at Walker Rd. and Kennedy Dr. in Caddo Parish: $3,286,552.85

Other:

  • Sidewalks along LA 24 in Terrebonne Parish: $121,270.40
  • Sidewalks along Civic Center Blvd. in Terrebonne Parish: $168,542.07

For more information, visit www.dotd.la.gov.

Copyright 2021 Nexstar Media Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Latest BRProud Articles

More Local News

Stay up to date with the latest news by downloading the BRProud App from the App Store or Google Play.

Trending Stories